The good news: Summer Reading registration is going phenomenally well, with over 1,000 more people signed up by the close of business Wednesday than the previous year.
The bad news: The elevator has been acting up intermittently for over two weeks. the repairman has been here multiple times, trying to figure out the issue. We've replaced relays, tracked down the original plans for the system (which had gone astray during a changeover in vendors) and tried a new overload assembly. Problems persists. At least when it stopped working, it was going to the lower level and parking there, usually with the door open. Finally, this morning, it failed again while the repairman was on site. Fingers crossed that this will lead to the full resolution of the problem. But the age of the building and its systems is an issue as costly repairs of aging systems become a regular budget item.
The hopeful news: The windows that were rotting (poorly sealed during installation 20 years ago) are being patched and mended. The company doing the work is having good success with the temporary fix that should last 3-5 years. At about one-tenth the cost of replacement windows, the temporary fix was determined to be the correct course of action for the short-term, since plans for future expansion would replace all of those windows.
Never a dull moment...
Showing posts with label windows. Show all posts
Showing posts with label windows. Show all posts
Thursday, June 10, 2010
Wednesday, November 18, 2009
Looking for One More Nice Day
The roof replacement project is not quite done. The flat roof has been completely replaced and sealed. However, the final pieces of the project - flashings and the door jab and trim for the access door leading out onto the roof. While it cannot be seen from street level, you'll know its done when the construction dumpster leaves the Library's parking lot, re-opening all of the spaces for use.
Our protesters did not stay long, only about 5 hours total. Our rat hand puppet from the Youth Services storytime supplies did come to visit his larger inflatable rat brethren during his stay, sitting in the window of my office.
During tonight's meeting of the Board of Trustees, the replacement of windows in the Original Library will be considered. We have proposals from several window vendors. Replacement is needed only for seven windows in the Original Library. With the Original Library likely to remain in any future expansion, the replacement of those windows is appropriate as a long term solution. The remainder can be repaired and resealed, with only a few replacement parts needed. This is good news and will keep costs down, while addressing the problem areas.
Our protesters did not stay long, only about 5 hours total. Our rat hand puppet from the Youth Services storytime supplies did come to visit his larger inflatable rat brethren during his stay, sitting in the window of my office.
During tonight's meeting of the Board of Trustees, the replacement of windows in the Original Library will be considered. We have proposals from several window vendors. Replacement is needed only for seven windows in the Original Library. With the Original Library likely to remain in any future expansion, the replacement of those windows is appropriate as a long term solution. The remainder can be repaired and resealed, with only a few replacement parts needed. This is good news and will keep costs down, while addressing the problem areas.
Subscribe to:
Posts (Atom)