Thursday, October 28, 2010

The Rain Has Ended

Thankfully, the HVAC technician was able to get to the Library quickly. He determined that gasket on pipe in the boiler system was leaking and would have to be replaced. The pipe was isolated and heat restored, pending replacement of the gasket tomorrow since that's apparently a two-man job.

The elevator is working fine after its earlier bid for attention.

Early next week, I hope to announce our new Head of Maintenance. He can't start soon enough, in my opinion.

It's Raining in the Library!

A pipe is leaking in the lower level lobby. We know its boiler system water because it smells like anti-freeze.

I shut off the pumps and water to the system at the boiler per the instructions of our HVAC maintenance company. An HVAC technician is on his way.

Plus, just to pile on the problems this morning, the elevator was acting up again. Thankfully, it continues to "park" itself at the lower level so anyone aboard may exit.

Acting as Head of Maintenance while we are searching for one, I can tell you that I understand more fully than ever the extent of the issues with this building. We cannot get a new Head of Maintenance started soon enough!

Wednesday, July 14, 2010

Not Again! Elevator Problems Continue.

While the fix from June last for several weeks, the intermittent problems have cropped up again. After finally making in in before the Library opened this morning, the technician was able to diagnose the problem: overwork!

Our elevator is not designed for the constant use it receives. With over 500,000 visits last year, that is a lot of trips up and down, especially since you cannot get a stroller into the Children's Department without it. Apparently, the constant use causes the oil to overheat which cause the shut-down. I guess that answers the "why does it always happen when we're busy?" question.

On to the next fix: retrofitting with a cooling system for the oil. Our biggest roadblock is that it would need to be vented outside the building. Let's hope they can find a clear (physically, as in no pipes in the wall, etc.) and simple means of doing so.

Thursday, June 10, 2010

Elevator, Windows and Summer Reading

The good news: Summer Reading registration is going phenomenally well, with over 1,000 more people signed up by the close of business Wednesday than the previous year.

The bad news: The elevator has been acting up intermittently for over two weeks. the repairman has been here multiple times, trying to figure out the issue. We've replaced relays, tracked down the original plans for the system (which had gone astray during a changeover in vendors) and tried a new overload assembly. Problems persists. At least when it stopped working, it was going to the lower level and parking there, usually with the door open. Finally, this morning, it failed again while the repairman was on site. Fingers crossed that this will lead to the full resolution of the problem. But the age of the building and its systems is an issue as costly repairs of aging systems become a regular budget item.

The hopeful news: The windows that were rotting (poorly sealed during installation 20 years ago) are being patched and mended. The company doing the work is having good success with the temporary fix that should last 3-5 years. At about one-tenth the cost of replacement windows, the temporary fix was determined to be the correct course of action for the short-term, since plans for future expansion would replace all of those windows.

Never a dull moment...