Thankfully, the HVAC technician was able to get to the Library quickly. He determined that gasket on pipe in the boiler system was leaking and would have to be replaced. The pipe was isolated and heat restored, pending replacement of the gasket tomorrow since that's apparently a two-man job.
The elevator is working fine after its earlier bid for attention.
Early next week, I hope to announce our new Head of Maintenance. He can't start soon enough, in my opinion.
Showing posts with label boiler. Show all posts
Showing posts with label boiler. Show all posts
Thursday, October 28, 2010
It's Raining in the Library!
A pipe is leaking in the lower level lobby. We know its boiler system water because it smells like anti-freeze.
I shut off the pumps and water to the system at the boiler per the instructions of our HVAC maintenance company. An HVAC technician is on his way.
Plus, just to pile on the problems this morning, the elevator was acting up again. Thankfully, it continues to "park" itself at the lower level so anyone aboard may exit.
Acting as Head of Maintenance while we are searching for one, I can tell you that I understand more fully than ever the extent of the issues with this building. We cannot get a new Head of Maintenance started soon enough!
I shut off the pumps and water to the system at the boiler per the instructions of our HVAC maintenance company. An HVAC technician is on his way.
Plus, just to pile on the problems this morning, the elevator was acting up again. Thankfully, it continues to "park" itself at the lower level so anyone aboard may exit.
Acting as Head of Maintenance while we are searching for one, I can tell you that I understand more fully than ever the extent of the issues with this building. We cannot get a new Head of Maintenance started soon enough!
Labels:
boiler,
building,
elevator,
job openings,
maintenance
Wednesday, October 6, 2010
Boilers, Compressors and Head on Maintenance Candidates
The saga of the Library building's systems issues continues. The boiler is down and awaiting repairs. The HVAC compressor on Unit 1 is down and awaiting repairs. The parts for both repairs have been ordered. The HVAC repair should occur this week, according to the estimated arrival date for the parts. The boiler parts will take 3 more weeks. In the meantime, ambient temperatures in the Library will depend on the weather. The advice we are giving staff and customers is to dress in layers for the next 3-4 weeks when you come to the Library!
On a positive note, the first interviews for Head of Maintenance are underway. We received over 160 resumes for the position, many from highly qualified candidates. From the great pool of applicants, I am confident that a Head of Maintenance will be hired within the next month and working within the next six weeks or so.
Personally, I am looking forward to having someone other than me climbing the ladder to the roof to look at the HVAC unit and crawling on the floor of the Boiler Room to peer into the boiler with the contractors.
On a positive note, the first interviews for Head of Maintenance are underway. We received over 160 resumes for the position, many from highly qualified candidates. From the great pool of applicants, I am confident that a Head of Maintenance will be hired within the next month and working within the next six weeks or so.
Personally, I am looking forward to having someone other than me climbing the ladder to the roof to look at the HVAC unit and crawling on the floor of the Boiler Room to peer into the boiler with the contractors.
Wednesday, September 22, 2010
HVAC Issues Again
The aging Library building and its systems strike again:
The HVAC problem is with the valves that control the flow of refrigerant in Unit 1, which cools the northeast quadrant of the building. This is one of four units that cool the building. The Library's HVAC contractor is working to isolate the issue and hopefully replace just the valves rather than the whole compressor unit (which would entail a crane and huge expense). Of course, this is not under warranty.
In the meantime, Unit 1 has been bypassed for cooling but the fans/blower will continue to run. That should keep the affected areas at a reasonable temperature until the full repairs can be made. With the weather forecast for tomorrow, I'm grateful for that.
The ongoing expenses of the aging building and its systems are having a negative impact the operating budget. The boiler needs repairs prior to the beginning of the heating season. Keep your fingers crossed that the elevator doesn't break down again too...
The HVAC problem is with the valves that control the flow of refrigerant in Unit 1, which cools the northeast quadrant of the building. This is one of four units that cool the building. The Library's HVAC contractor is working to isolate the issue and hopefully replace just the valves rather than the whole compressor unit (which would entail a crane and huge expense). Of course, this is not under warranty.
In the meantime, Unit 1 has been bypassed for cooling but the fans/blower will continue to run. That should keep the affected areas at a reasonable temperature until the full repairs can be made. With the weather forecast for tomorrow, I'm grateful for that.
The ongoing expenses of the aging building and its systems are having a negative impact the operating budget. The boiler needs repairs prior to the beginning of the heating season. Keep your fingers crossed that the elevator doesn't break down again too...
Subscribe to:
Posts (Atom)