From the Suggestion Box: A/C is always too strong!

In light of our recent HVAC issues, it is not surprising that library users are feeling the cold, or the heat, too much in certain areas of the Library. The building has four roof-top units (RTUs) that are part of the heating, ventilation and air conditioning system. They produce warmer or colder air and circulate it through the building. One of the four RTUs is currently circulating air only, not heating or cooling. This cause hot or cold spots in the Library, as the three fully-functional units struggle to keep the average temperature in the building within set limits. The outdated control system on the HVAC in the Library does not allow the kind of granular control that would mitigate the hot or cold spots.

The good news: the project to replace the HVAC RTUs and control system, along with some reworking of air ducts and air balancing, should go out to bid this week. We are awaiting the final set of specifications from KJWW Engineering for the project before publishing the invitation to bid.

The bad news: until the project is done, the best I can do is remind you to wear layers when coming to the Library. With the changing weather, the indoor air temperature is unpredictable.

Tuesday, August 28, 2012

One Down, Three Cooling

The news is not good. One of the HVAC roof top units (RTU's) is no longer functioning. With a price tag of about $5,000 to fix and the HVAC Replacement Project specifications and bid package slated to go before the Board of Trustees tomorrow night, the Library will limp along with three functional units. The age of the RTU that is down is a factor in the cost of the repair, making replacement parts expensive and difficult to find.

Please be aware that this will only exacerbate the problem of hot and cold spots in the Library, as the remaining RTU's struggle to keep the temperatures down in the building. Because our antiquated control system does not allow for granular control of air handling, the options for dealing with this problem are limited.

Wear layers and bear with us as the Library addresses its aging infrastructure issues.


Thursday, September 24, 2009

Old Building, New Problems

Along with all of the interior changes to shelving and space use, Trustees and staff have also been assessing the condition of the building and its systems with an eye to keeping it functional for another 3-5 years before renovating or expanding. In your November/December Library newsletter, the cover article will be on this very topic.


The building is old, fast approaching its 20th year. It is a well-used public building, meaning that it gets significant wear-and-tear. It also has some quirks. Take the HVAC system for example. For some reason unknown to me or any Trustee/staff member who was here at the time, the rooftop air conditioning unit added when the lower level was built out in 1996 is a model designed for the Canadian market, making it difficult to obtain parts when needed. Another example: rubber membrane roofing was used to cover the sides of the gable for the roof access door, like siding. Not a standard use of the product, by any means.


Overall, the age of the building means that all of the systems with 15-20 years expected service lives are no longer as reliable as they once were. Things are starting to break down. You may remember our recurring elevator issues this summer or the roof leaks from the spring. The roofing issues are more immediate now, as they are increasing over time. Look for a roof repair and replacement project going to bid in early October.

This project will repair damaged portions of the shingled roof and entirely replace the rubber membrane portion, plus the decking and insulation beneath that portion. About one third of the Library's roof is flat, though it cannot be seen from street level. Four rooftop air conditioning units and the skylight over the main stairwell are hidden from view by the pitched, shingled portions of the roof.


Funds for the roof repair and replacement will come from the Library's only capital and emergency fund: the Special Reserve Fund. With sources of income for this fund being transfers in from the General (aka Operating) Fund and Developer's Annexation Fees, which are collected through an intergovernmental agreement with the Village of Plainfield, its income has dropped sharply. In FY2006, over $244,000 was collected from those fees. In FY2009, it was just over $13,000. Special Reserve Funds were used to purchase the property at 15022 S. Division Street during FY2009 and will be used to complete the contracted purchase of the Route 59 parking lot in 2010. Today's Special Reserve Fund balance is $600,000, which includes the earmarked funds for that contracted purchase and the roof repair and replacement.

Wednesday, May 27, 2009

It's raining, it's pouring...

Unfortunately, it's also dripping in the library. Even with regular maintenance an upkeep, things get old - especially heavily-used public buildings. At 19 years old, the roof and HVAC systems are reaching the end of their expected lifespans (generally 15-20 years). As extensive repairs and/or replacement becomes necessary, those costs will impact the library's budget. The building looks good and has been well-maintained - but it will not last forever without updating.