A resident recently asked me about the possibility of off-loading some collection or service to satellite facility that could be located in one of the vacant strip malls around town. Surely, the library could get space donated and then could run a branch?
This is an idea that the board of Trustees have investigated before - and will again. The concept of leasing rather than building an additional library facility as part of a revised referendum plan is under consideration by Library Board of Trustees. Over the next year, you will see and hear more about the reworking of the referendum and that planning process. Without additional funds, the Library’s budget today is insufficient to support a second facility unless major cuts are made to existing services. With demand for service outstripping income, plus an aging building that costs more to maintain every year, the cost of furnishing and stocking even a small strip mall space and the ongoing cost of rent, staffing and utilities are beyond our means. Checkouts increased 318% in the last ten years while the Library’s income increased only 161%. For now, the Library Board of Trustees is investing the Library’s limited funds in maintaining the existing building and making maximum use of the existing space. In the future, with funding from a referendum, a leased facility in a strip mall may be possible.
As for receiving a donated space, both the Library and Park District need more space, but so far there are no offers of donated space for either entity. Even if a benefactor gave us a furnished and stocked branch today, drastic cuts to existing services would have to be made in order to operate it.
Yes, the Library's budget is that tight. No, there is nothing left to cut that won't leave a community need unserved. Last year, I posted "Drafting the FY11 Budget" about the Library's budget freeze, despite a use increase of more than 20%. As always, the Library will make do within its means. But taking on something new can only happen if it comes with money to support it today and into the future.
Showing posts with label branch. Show all posts
Showing posts with label branch. Show all posts
Wednesday, April 6, 2011
Tuesday, March 31, 2009
Question of the Day: Why can't the Library use an existing building(s) for its expansion?
There are three main reasons why an existing building was not selected for the library's expansion at this time.
#1 Libraries cannot use just any building due to the live-load capacity of the structure. Book stacks are HEAVY. They require 150lbs per square foot live load capacity. Typical construction is 70-90lbs. Reinforcing a structure to accommodate that live load generally costs more than new construction. Grocery stores are one of the few types of construction that would be similar in live load capacity needed.
#2 The size of the buildings available is an issue. Many of the building suggested when this question is asked, the old Police Station and the former Applebee's restaurant for example, are not large enough to meet the community's need for a library location. The proposed branch is 30,000 sq ft - about 6 times the size of the former Applebee's building. If smaller buildings are used, multiple branches will be necessary to meet the community's need. The biggest expense in operating a library is staff. The more locations you have, the more staff you need and therefore higher operating costs. The two facility approach was selected to balance space needs and operating cost.
#3 The location of the existing building must meet the needs of the community. Putting a second library within a mile or two of the existing building when the Library District stretches from north of Boughton Road to south of Caton Farm Road, west to Arbeiter Road and east to Kings Road/Gaylord Road. Most of the buildings available are simply too close to the downtown library.
#1 Libraries cannot use just any building due to the live-load capacity of the structure. Book stacks are HEAVY. They require 150lbs per square foot live load capacity. Typical construction is 70-90lbs. Reinforcing a structure to accommodate that live load generally costs more than new construction. Grocery stores are one of the few types of construction that would be similar in live load capacity needed.
#2 The size of the buildings available is an issue. Many of the building suggested when this question is asked, the old Police Station and the former Applebee's restaurant for example, are not large enough to meet the community's need for a library location. The proposed branch is 30,000 sq ft - about 6 times the size of the former Applebee's building. If smaller buildings are used, multiple branches will be necessary to meet the community's need. The biggest expense in operating a library is staff. The more locations you have, the more staff you need and therefore higher operating costs. The two facility approach was selected to balance space needs and operating cost.
#3 The location of the existing building must meet the needs of the community. Putting a second library within a mile or two of the existing building when the Library District stretches from north of Boughton Road to south of Caton Farm Road, west to Arbeiter Road and east to Kings Road/Gaylord Road. Most of the buildings available are simply too close to the downtown library.
Thursday, March 12, 2009
Question of the Day: Will the north side branch be in or near Bolingbrook?
The Library is still in negotiations for property and has not announced an exact location. In general, the target area was east of Normantown Road, north of 135th, west of Essington Road, and south of 111th, with the main focus on the grid along and between 248th Street, 119th Street, Plainfield-Naperville Road, and 127th Street.
The longest drive-times to the downtown Plainfield location are from the far north areas of the District, including the Bolingbrook portion of the district, prompting the focus for property acquisition to be in that area.
The Library District serves the Village of Plainfield, the part of the Village of Bolingbrook that is in Wheatland Township, the part of the Village of Romeoville that is in Plainfield Township, unincorporated Wheatland Township, and unincorporated Plainfield Township. District boundaries stretch from north of Boughton Road on the far east side of the district to just west of Arbeiter Road in Kendall County between Route 126 and Caton Farm Road.
The longest drive-times to the downtown Plainfield location are from the far north areas of the District, including the Bolingbrook portion of the district, prompting the focus for property acquisition to be in that area.
The Library District serves the Village of Plainfield, the part of the Village of Bolingbrook that is in Wheatland Township, the part of the Village of Romeoville that is in Plainfield Township, unincorporated Wheatland Township, and unincorporated Plainfield Township. District boundaries stretch from north of Boughton Road on the far east side of the district to just west of Arbeiter Road in Kendall County between Route 126 and Caton Farm Road.